Services - Home •
Services

Design, production, installation and maintenance of automatic induction door, rolling door, garage door, door, door, revolving door, etc.;

道闸、门禁、停车场系统、蓝牙、通道管理系统、通道闸机、车牌识别系统、高清车牌识别一体机;

Road gate, access control, parking lot system, Bluetooth, channel management system, channel gate machine, license plate recognition system, HD license plate recognition;

岗亭、保安岗亭、钢结构岗亭、铝塑板岗亭、不锈钢岗亭、防腐木岗亭、金属雕花板岗亭、值班警亭;

Booth, the security booth, booth of steel structure, aluminum-plastic plate booth, stainless steel booth, wood preservative boxes, carved metal plate booth, on duty police Pondok;

交通设施、道路护栏;

Traffic facilities, road fence;

广告、写真。

Advertising, portrait.

服务流程

Service flow

1、客户提出需求:

1, customer demand:

客户通过电话、电子邮件或在线订单方式提出自己的基本需求,包括:

Customers by phone, email or online order form to put forward their basic needs, including:

(1.产品介绍

(1 product introduction

(2.工程预算范围

(2 project budget

(3.基本功能需求

(3 basic functional requirements

(4.基本设计要求

(4 basic design requirements

2、我们提供“解决方案和报价”:

2, we provide "solutions and quotations":

回答客户的咨询,对客户的需求予以回复,提供实现方案和报价以供客户参考和选择。

Answer customer inquiries, respond to customer needs, provide implementation solutions and quotations for customer reference and selection.

3、确定合作意向:

3, determine the intention of cooperation:

双方以面谈、电话或电子邮件等方式,针对项目内容和具体需求进行协商。并签订合同支付预付款。

The two sides to interview, telephone or e-mail, etc., for the project content and specific needs of consultation. And signed a contract to pay the advance payment.

4、提供材料:

4, provide materials:

客户提供项目所需书面资料(电子稿)与相关要求,以书面或者任何存储媒介传送我方。我方将开始进行设计方案的深化。

The client shall provide the written information (E) and the relevant requirements of the project, in writing or any storage media to transfer our. We will begin to deepen the design scheme.

5、设计方案:

5, design:

我方按照需求说明进行设计方案的细化,并向客户提供设计稿。客户审核并确认设计方案后,我方进行整体设计方案工程实施。

We follow the requirements of the detailed design of the program, and to provide customers with design draft. Customer audit and confirm the design plan, we carry out the implementation of the overall design project.

6、工程实施:

6, engineering implementation:

(1.开始工程实施;工程竣工后,双方组织相关人员现场验收;

(1 to start the implementation of the project; after the completion of the project, the two sides organize relevant personnel on-site inspection;

(2. 验收项目包括产品质量、安装调试是否规范、达到双方约定的功能要求等;

(2 acceptance of the project, including product quality, installation and commissioning of the specification, to meet the requirements of the functional requirements of the two sides, etc.;

(3.若现场需要调整的,根据客户的意见或建议双方确认后进行调整,直到验收合格。

(3 if the site needs to be adjusted, according to the customer's comments or suggestions to the two sides confirmed after adjustment, until the acceptance of qualified.

7、收取余款:

7, collect the balance:

客户按照合同规定支付余款,我方在收到余款后将相关手续递交给客户,使客户正常使用设备。至此,工程竣工结束。

Customers in accordance with the provisions of the contract to pay the balance, our after receipt of balance will relevant procedures submitted to client, enabling customers normal use of the equipment. At this point, the completion of the project.

8、后期维护:

8, post maintenance:

我司自行安排人员对日后的设备进行日常维护,质保期满后也可与我方另行签订《维保协议》,由我方继续提供维护服务。

Our own arrangements for personnel responsible for the future of the equipment maintenance, after the expiration of the warranty can also be with us separately signed the maintenance agreement, by my side to continue to provide maintenance services.


 

 






ABOUT
NEWS
CASES
PRODUCTS
DOWNLOAD
FOLLOW
SWEEP

 njlushun  在线客服  在线客服
TOP
Scan the QR code
Kdesign